Project
Project Type
The Bluebells is a high-quality residential development by Esquire Developments, characterized by its compact site layout and premium finishes. The project required a highly disciplined approach to scaffolding delivery and material management to maintain safety and progress within a restricted footprint.
Overcoming Site Constraints
In a compact development, the margin for error in logistics is minimal. KAS implemented a specialized management strategy to ensure the site remained functional and safe:
Precision Material Planning: With limited storage areas available on-site, KAS utilized a "Just-in-Time" delivery model. Materials were delivered and moved directly to the workface, preventing site congestion and ensuring other trades could operate without obstruction.
Workface Placement: Strategic planning ensured that scaffold components were positioned exactly where needed, reducing manual handling time and increasing the speed of erection and adaptation.
Coordinated Logistics: Close liaison with the site management team at Esquire Developments ensured that deliveries did not clash with other high-pressure site activities, such as plant movements or material drops for other trades.
Operational Excellence
The success of The Bluebells project demonstrates KAS Scaffolding’s ability to thrive on sites where space is at a premium. By prioritizing logistical foresight and on-site coordination, we provided a seamless access solution that supported the build programme without adding to the site's footprint challenges.
Key Highlights
Optimized Footprint: Maximum efficiency in material storage and placement.
Site Fluidity: Ensuring scaffold operations never hindered site-wide vehicle or pedestrian movement.
Proactive Liaison: Constant communication with the Principal Contractor to align with the evolving build schedule.